PROJECT HANDOVER CHECKLIST

RESIDENTIAL AUTOMATION

1. PHYSICAL INFRASTRUCTURE & CABLING

2. CONFIGURATION & COMMISSIONING (SYSTEM)

Functional Tests (Subsystems):

Interfaces & Scenes Tests:

3. RACK & NETWORK (TRIM)

4. PASSWORD MANAGEMENT AND DOCUMENTATION ("HANDOVER")

5. STRUCTURAL CHECK & RISK PROCEDURES

Post-Work Inspection:

Critical Customer Instructions (Acknowledgment):

6. TRAINING AND FINAL ACCEPTANCE

SERVICE ACCEPTANCE TERM

I, , declare that:

  • I performed the final walkthrough of the installation with the responsible technician.
  • All subsystems and features described in the project scope were properly tested, demonstrated, and are operating as expected.
  • I received the necessary training for basic system operation.
  • I received the pertinent documentation (user passwords and support contacts).

Disclaimer: By signing this term, I attest to the satisfactory completion of the services provided and the delivery of the installation in accordance with the contracted project. I declare that, as of this date, I have no outstanding complaints regarding the physical installation, configuration, or functionality of the delivered system, accepting the official completion of the work. Only the contractual warranty terms for equipment and services remain in effect.

Client Signature (tap to sign)

Responsible Technician Signature (tap to sign)